Text Size: A A

Planned Electrical System Maintenance –Bowerbank


Description of the event: Planned Electrical System Maintenance – Bowerbank
Date and Time of Interruption: Wednesday 09/18/2024 07:00 AM
Duration: 7:00 a.m. for approximately 2 hours
Rain Date:(if applicable) Thursday 09/19/2024 07:00 AM
Area Affected: Versant Power crews have scheduled maintenance to the electrical system in Bowerbank beginning at 7:00 a.m. Wednesday, September 18. The work will take approximately 2 hours to complete.

Customers on Seymour Cove Rd. may experience service interruptions during this time as crews replace equipment, work to improve reliability and prevent future outages.
Related Information: For your safety:
• Motorists are urged to slow down or move over and change lanes, when possible, if approaching utility crews working on roadways.
• Never touch a downed power line or a tree in contact with a downed line.
• Customers who use generators are reminded to ensure they are used in accordance with manufacturer guidelines at all times.

Customer information:
• You may report outages and other problems by using our Power Issue Report Form or directly from your Online Services account.
• You may also call our Customer Contact Center at (207) 973-2000.
• Please don’t report outages or emergencies to us through our social media channels, which are not monitored 24-7.

For updates, check our Live Outage & Restoration Map link below, or follow us on Twitter @versantpower.